HV earthing design studies in urban areas

HV earthing design studies in urban areas

HV earthing design studies in urban areas Robert Knott & Stephen Lilley Earthing system design for 11kV high voltage (HV) substations in developed, industrial or urban areas can prove challenging, particularly where the availability of land for the placement of...
The importance of impressed voltages

The importance of impressed voltages

The importance of impressed voltages Robert Knott & Stephen Lilley To meet global net zero targets, the construction of renewable energy installations is increasing. These generation sites are often installed adjacent to existing High Voltage (HV) infrastructure...
HV earthing design and analysis in the UK

HV earthing design and analysis in the UK

HV earthing design and analysis in the UK Robert Knott & Stephen Lilley With the UK electricity network undergoing a rapid increase in size to help accommodate new green generation facilities, bespoke earthing system design and earth fault studies are required to...