HV earthing design studies in urban areas

HV earthing design studies in urban areas

HV earthing design studies in urban areas Robert Knott & Stephen Lilley Earthing system design for 11kV high voltage (HV) substations in developed, industrial or urban areas can prove challenging, particularly where the availability of land for the placement of...
Lightning protection studies of UK renewable energy systems

Lightning protection studies of UK renewable energy systems

Lightning protection studies of UK renewable energy systems Robert Knott & Stephen Lilley The UK government has set targets to reach net zero by 2050, with a strategy for all electricity to be supplied by 100% zero-carbon generation by 2035. To achieve this...
The importance of impressed voltages

The importance of impressed voltages

The importance of impressed voltages Robert Knott & Stephen Lilley To meet global net zero targets, the construction of renewable energy installations is increasing. These generation sites are often installed adjacent to existing High Voltage (HV) infrastructure...
HV earthing design and analysis in the UK

HV earthing design and analysis in the UK

HV earthing design and analysis in the UK Robert Knott & Stephen Lilley With the UK electricity network undergoing a rapid increase in size to help accommodate new green generation facilities, bespoke earthing system design and earth fault studies are required to...
Visualizing the PQ curve

Visualizing the PQ curve

Visualizing the PQ curve Miguel Penagos To maintain system stability and manage diverse characteristics and resources, utilities and developers rely on PQ curve analysis. This analysis is particularly important for complying with FERC Order 827 at the Point of...