TransGrid Aerial Laser Survey (ALS) Project

TransGrid Aerial Laser Survey (ALS) Project

TransGrid Aerial Laser Survey (ALS) Project TransGrid Australia awarded Power Systems Consultants and OPTEN an aerial laser survey project requiring the surveying of 2500km of their transmission network throughout New South Wales in Australia. Aerial laser survey...
Ardrossan West Harmonics Study

Ardrossan West Harmonics Study

Ardrossan West Harmonics Study Overview PSC were engaged by ElectraNet, the electricity transmission network service provider for South Australia, to undertake investigation work for the replacement of the supply transformers, installation of a 15 MVAr capacitor bank,...
ElectraNet Telecommunications Planning

ElectraNet Telecommunications Planning

ElectraNet Telecommunications Planning ElectraNet engaged PSC for a 10 week period to continue aspects of the telecommunications planning effort while they were advertising the role of Telecommunications Planning Engineer. The main component of the work was preparing...
The role of BESS in future power systems, Part 2

The role of BESS in future power systems, Part 2

The role of BESS in future power systems, Part 2 Hesam Marzooghi & Djino Pirsic ​This is the second article in a two-part series aimed at highlighting the role of Battery Energy Storage Systems (BESS) in future power systems. In the first article (The role of BESS...
Network Extensions to Remote Areas

Network Extensions to Remote Areas

Network Extensions to Remote Areas Overview As operator of the Australian National Electricity Market (NEM), AEMO manage the connections to the shared grid. The geography of Australia gives rise to situations where new generation can be very remote from the grid....